Renovation with factory-producer elements
In the production of facade elements, EstNor relies on an extensive knowledge base and decades of experience, offering the best competence in increasing the energy efficiency of buildings.
Industrial Reconstruction
|
EstNor Offers
|
![]() |
Surveying
|
Architecture
|
Production of insulated facade elements at the factory |
![]() |
Window installation in elements at the factory, packaging, and transport |
![]() |
Installation of facade elements on the construction site |
![]() |
![]() |
KredEx Reconstruction Grant 2022-2027
The purpose of the KredEx support measure is to finance the comprehensive reconstruction of apartment buildings, as well as the replacement of heating devices in buildings with gas, stove, or electric heating with devices using renewable energy sources or connecting them to a district heating network. Within the framework of supported activities, energy efficiency of apartment buildings is enabled and the use of renewable energy is encouraged. More information at KredEx.ee.
EstNor participated very successfully in the pilot project of the first Kredex reconstruction support measure in 2022, securing the production of facade elements for 12 apartment buildings. Facade elements for all 12 buildings are produced at the EstNor factory on a wooden structure. Insulation wool is installed in the elements, new energy-efficient PVC windows are installed and finished, and the facade finishing board is also pre-installed at the EstNor factory.
Within the framework of the KredEx support measure project, EstNor is the very first producer and we have produced the highest volume of facade elements.
Factory work is planned based on the principle that the more is done in the factory and the less is done on-site, the faster the installation of facade elements proceeds and the less residents are disturbed by construction activities.
One of the biggest advantages of insulating a building with factory-produced insulated timber-frame elements is definitely the speed of work – while insulation work on a 5-story building with 5 stairwells using expanded polystyrene on-site can last almost a year, the building facade is covered with our factory-produced facade elements in just 3-4 weeks. The difference in working time is remarkably large.
When insulating an apartment building with facade elements produced at the EstNor factory, scaffolding is not required.
Scaffolding restricts residents’ views from windows and represents an increased security risk throughout the duration of renovation work carried out on the site.
Renovating old apartment buildings with factory-produced facade elements helps to make the building energy-efficient quickly!
The use of factory-produced facade elements in the renovation of old apartment buildings offers many advantages – improved energy efficiency, reduced construction time, and an extended lifespan for the building. Facade elements are manufactured in a controlled factory environment, ensuring consistent and high quality. Additionally, the use of elements with standardized dimensions allows for a simplified installation process, thereby reducing the time spent on renovation.
Simplified Steps of the Renovation Process
Watch an animation of the renovation process with factory-produced facade elements.